Back to News

Borealis announces extension of the acceptance period in the context of the voluntary reopening of the takeover bid on Rosier

Borealis, a leading provider of innovative solutions in the fields of polyolefins, base chemicals and fertilizers, announces today that it has published a second supplement to the prospectus in the framework of the mandatory public takeover bid launched by Borealis on 2 September 2013 on all Rosier shares which are not already held by Borealis. This supplement concerns mainly the publication of a press release by Rosier, on its interim statement for the second half of 2013.

In addition, Borealis announces that it has been informed that the board of directors of Rosier has approved a supplement to its memorandum in reply. The supplement to the memorandum in reply concerns a change in the position of Mr Robert Semoulin, independent director of Rosier, regarding his  intention to transfer or not to transfer his shares to Borealis in the context of the bid. This supplement to the memorandum in reply is also included in the second supplement to the prospectus.

In light of the information contained in the second supplement to the prospectus, Borealis will extend the acceptance period in the context of the voluntarily reopening of the takeover bid to 4 November 2013 (inclusive) at 4 pm CET (instead of 28 October 2013 previously). The payment of the shares which will be tendered during the voluntary reopening as from 14 October 2013 is scheduled on 8 November 2013.

Any shareholder who has tendered shares during the acceptance period of the voluntary reopening of the bid (i.e. as from 14 October 2013) may withdraw their acceptance until 4 November 2013 (inclusive) at 4 pm CET in accordance with the procedure as set out in the acceptance form.

The prospectus (with the memorandum in reply attached as an annex), the acceptance form, the first and second supplement to the prospectus and the supplement to the memorandum in reply may be obtained free of charge at the counters of ING België NV, or by telephone (+32(0)2 464 60 01 (Dutch), +32(0)2 464 60 02 (French) and +32(0)2 464 60 04 (English)).

An electronic version of the prospectus (with the memorandum in reply attached as an annex), the acceptance form, the first and second supplement to the prospectus and the supplement to the memorandum in reply is also available on the internet at www.ing.be, www.rosier.eu and www.borealisgroup.com.

END

For further information please contact:

Kerstin Meckler, Director Communications
Tel. +43 (0)1 22 400 389 (Vienna, Austria)
e-mail: kerstin.meckler@borealisgroup.com 

Downloads
Borealis announces extension of the acceptance period in the context of the voluntary reopening of the takeover bid on Rosier English, Dutch, French
Media Contact
Group Media desk
Virginia Wieser, Lena Lehner
+43 1 22 400 899 (Vienna, Austria)
media@borealisgroup.com

Latest News

News – 18/04/2024

Borealis and Borouge expand HVDC production capacity to meet the needs of the energy transition

Read more

Media Release – 09/04/2024

Borealis invests EUR 4.5 million in Porvoo steam cracker, enabling increased share of circular raw materials used in production

Read more

Media Release – 02/04/2024

Borealis further expands its advanced mechanical recycling capacity with closing the acquisition of Integra Plastics AD

Read more

Media Release – 28/03/2024

FDA clears Borealis’ Borcycle™ M recycled plastics for use in food-grade packaging

Read more

News – 27/03/2024

Update on the Kallo Case

Read more

Media Release – 26/03/2024

Borealis and AKVA group launch groundbreaking Polarcirkel™ workboat hull crafted from renewable feedstock-based plastic

Read more

News – 22/03/2024

Annual Report 2023 published

Read more

Media Release – 20/03/2024

Project STOP marks further major milestones in 2023 and makes significant progress in the Project STOP Banyuwangi Hijau expansion program

Read more

Media Release – 19/03/2024

Borealis once again ranked first among top applicants in the European Patent Index 2023 in Austria

Read more